To view this news release in PDF form please Click Here

All News Releases and Filing
Please visit www.sedar.com for a complete list of Jasper's news releases.

News Releases
Click on any of the news releases below to view them in PDF:

September 2, 2008:
JASPER MINING CORPORATION AMENDS EXPIRATION DATE OF SHARE OPTION GRANTS

August 28, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM AND TUNGSTEN RESULTS FROM MCFARLANE PROPERTY

August 21, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $1,200,000 WITH ANACORT CAPITAL INC.

July 23, 2008:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

July 11, 2008:
JASPER MINING CORPORATION CONTINUES TO ANNOUNCE HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

July 8, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $2,600,000.00 WITH MINERALFIELDS

July 2, 2008:
JASPER MINING CORPORATION COMMENCES 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

June 24, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM THREE MORE HOLES ON MCFARLANE PROPERTY

June 20, 2008:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF RESULTS TO DATE ON MCFARLANE PROPERTY

May 29, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE
MOLYBDENUM RESULTS FROM FOUR MORE HOLES ON MCFARLANE
PROPERTY

May 26, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY

May 6, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY AND SOME CORRECTIONS TO THE PRESS RELEASE OF MAY 2, 2008

May 2, 2008:
JASPER MINING CORPORATION ANNOUNCES HIGH GRADE ANALYTICAL RESULTS FROM DRILL PROGRAM ON MCFARLANE PROPERTY

April 11, 2008:
JASPER MINING CORP. COMPLETES $21,000 NON-BROKERED FINANCING

April 8, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

April 4, 2008:
JASPER MINING CORP. COMPLETES $133,000 NON-BROKERED FINANCING

April 2, 2008:
JASPER MINING CORPORATION TO RAISE AN ADDITIONAL $21,000

March 12, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

March 7, 2008:
JASPER MINING CORPORATION TO RAISE $133,000

March 4, 2008:
JASPER MINING CORP. COMPLETES $367,500 NON-BROKERED FINANCING

Febuary 25, 2008:
JASPER MINING CORPORATION TO RAISE $367,500

January 21, 2008:
JASPER MINING CORPORATION INITIATES IP GEOPHYSICAL PROGRAM
AND FURTHER DRILLING ON MCFARLANE PROPERTY

December 19, 2007:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

December 11, 2007:
JASPER MINING CORPORATION CONTINUES DRILL PROGRAM ON MCFARLANE PROPERTY

December 6, 2007:
JASPER MINING CORPORATION CLOSES $150,000 PRIVATE PLACEMENT

November 19, 2007:
JASPER MINING CORPORATION COMMENCES FOLLOW-UP DRILL PROGRAM ON MCFARLANE PROPERTY

November 5, 2007:
JASPER MINING CORPORATION CLOSES $700,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 26, 2007:
JASPER MINING CORPORATION CLOSES $2,800,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 25, 2007:
JASPER MINING CORPORATION ANNOUNCES FOLLOW-UP EXPLORATION PROGRAM FOR MCFARLANE PROPERTY

October 5, 2007:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $3,500,000.00 WITH MINERALFIELDS

September 19, 2007:
FINAL SOIL RESULTS FROM ERIE CREEK PROPERTY

August 9, 2007:
PROSPECTING RESULTS FROM McFARLANE PROPERTY

July 12, 2007:
MANAGEMENT DISCUSSION ON LATEST HIGH GRADE MOLYBDENUM RESULTS FROM McFARLANE PROPERTY; 0.889% Mo OVER 7.3 M.

July 4, 2007:
JASPER MINING CORPORATION ANNOUNCES A HIGH GRADE MOLYBDENUM INTERVAL OF 7.3 METRES GRADING 0.889% MOLYBDENUM ON THE McFARLANE PROPERTYK

June 28, 2007:
JASPER MINING CORPORATION ANNOUNCES FURTHER RESULTS; ADDITIONAL DRILLING ON ERIE CREEK

May 28, 2007:
JASPER MINING CORPORATION DRILLS MULTIPLE HOLES CONTAINING MOLYBDENUM, COPPER AND TUNGSTEN AT ERIE CREEK

May 15, 2007:
JASPER MINING CORPORATION MOBILIZES DIAMOND DRILL ONTO McFARLANE PROPERTY

April 27, 2007:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM ERIE CREEK PROPERTY

April 9, 2007:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF
RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 27, 2007:
JASPER MINING CORPORATION - DIAMOND DRILL RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 9, 2007:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL TENURES BETWEEN LYDY AND MCFARLANE PROPERTIES

February 16, 2007:
JASPER MINING CORPORATION MOBILIZES ON TO ERIE CREEK PROPERTY

February 9, 2007:
JASPER MINING CORPORATION DISCUSSION OF SOIL RESULTS FROM ERIE CREEK PROPERTY AND THE ADDITION OF 5 MINERAL TENURES

January 23, 2007:
JASPER MINING CORPORATION 2007 UPDATE

December 21, 2006:
JASPER MINING CORP COMPLETES $50,000.00 NON-BROKERED FINANCING

December 14, 2006:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION ON RESULTS OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 12, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION
OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 11, 2006:
JASPER MINING CORPORATION TO RAISE $50,000.00 BY WAY OF PRIVATE PLACEMENT

November 29, 2006:
JASPER MINING CORPORATION ANNOUNCES SOIL RESULTS FROM ERIE CREEK PROPERTY

November 10, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

November 1, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL McFARLANE CELLS

October 25, 2006:
JASPER MINING CORPORATION COMMENCES IP GEOPHYSICAL SURVEY ON ISINTOK PROPERTY

October 18, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS FROM
DIAMOND DRILL PROGRAM ON IRONY PROPERTY

October 17, 2006:
JASPER MINING CORPORATION CONTINUES DIAMOND DRILLING ON ISINTOK PROPERTY

September 29, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SAWYER PROPERTY

September 28, 2006:
JASPER MINING CORPORATION DISCUSSION OF RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 26, 2006:
JASPER MINING CORPORATION ANNOUNCES FINAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 6, 2006:
JASPER MINING CORPORATION ANNOUNCES AIRBORNE GEOPHYSICAL RESULTS FROM STORM KING PROPERTY

September 5, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SANCA PROPERTY

September 5, 2006:
JASPER MINING CORPORATION COMMENCES DIAMOND DRILL PROGRAM ON IRONY PROPERTY

August 29, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

August 28, 2006:
JASPER MINING CORPORATION ANNOUNCES ADDITIONAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 11, 2006:
JASPER MINING CORPORATION ANNOUNCES CORRECTION ON INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 10, 2006:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 3, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON McFARLANE PROPERTY

August 1, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON LYDY PROPERTY

June 26, 2006:
JASPER MINING CORPORATION ANNOUNCES COMMENCEMENT OF AEROQUEST AIRBORNE GEOPHYSICAL SURVEY ON CRETACEOUS GRANITE PROJECT

June 6, 2006:
JASPER MINING CORPORATION - MANAGEMENT SPECULATION REGARDING RESULTS OF RECENT GEOPHYSICAL SURVEY ON IRONY PROPERTY

June 1, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON IRONY PROPERTY

May 30, 2006:
JASPER MINING ANNOUNCES MOBILIZATION OF DRILL ONTO MCFARLANE PROPERTY

May 9, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

May 5, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON PROXIMAL PROPERTY AND ACQUISITION OF ADDITIONAL MINERAL TENURE

April 28, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

April 24, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL ISINTOK CELLS

JASPER MINING CORPORATION
1020, 833 - 4TH AVENUE S.W.
CALGARY, ALBERTA, T2P 3T5
TELEPHONE: (403) 297-9480, FAX: (403) 266-1487

September 4, 2008
Trading Symbol: JSP (TSX-V)
News Release No. 08-194

NEWS RELEASE

JASPER MINING CORPORATION - INITIAL DRILL RESULTS FROM 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

Jasper Mining Corporation (the “Company”) has received initial analytical results from the first two holes of the 2008 exploration program on its 100% owned Isintok property. The property comprises approximately 2,839 ha (7,015 acres or approximately 11.0 square miles), covering the drainage divide between McNulty and Isintok creeks. The property is located west of the Okanagan Valley in south-central British Columbia, approximately 27 km west-southwest of Summerland and 20 km north of Hedley.

A total of 24 diamond drill holes have been completed to date as part of the 2008 exploration program, in addition to 16 holes completed during the 2006 field season. The holes continue the Company’s evaluation of sub-surface mineralization in the general area drilled in 1982 and 19761979 by previous operators. A summary of the Company’s results from the 2006 diamond drill program were previously reported (see Press Release dated April 9, 2007).

In late 2006, the Company had an Induced Potential (IP) geophysical survey completed on the property. The results of the IP survey correlated very well with surface soil geochemical results and initial sub-surface drill results from 2006. The 2008 drill program is specifically intended to test a chargeability high defined by the IP anomaly.

Holes 17 and 18 (continuing sequentially from the last hole (IS-06-16) from 2006) were collared from the same pad, located along the southern north - south oriented “tail” of the coincident IP / soil anomaly. Hole 17. Both holes were oriented toward azimuth 270, with Hole 17 at an inclination of -45 and Hole 18 at -60 degrees. The pad is located approximately 30 m east of the surface trace of the IP anomaly.

The table on the following page is a compilation of high grade analytical results for copper +/molybdenum +/- silver +/- gold from the first two holes (IS-08-17 and 18) completed in 2008.

Hole
Number
From
(m)
To
(m)
Width
(m)
Cu
(%)
Mo
(%)
MoS22
(%)
Ag
(g/t)
Au
(g/t)
IS-08-17 83.41 89.21 5.80 0.119 0.002 0.004 0.147 0.003
including 83.41 84.13 0.72 0.275 0.0002 0.004 0.60 0.020
including 88.43 88.68 0.25 0.580 0.151 0.252 0.60 0.01
including 89.00 89.21 0.21 0.232 0.003 0.005 1.70 0.008
IS-08-18 10.82 12.23 1.41 0.290 0.018 0.030 2.99 0.096
including 10.82 11.71 0.89 0.320 0.021 0.035 3.80 0.123
including 11.71 12.23 0.52 0.239 0.013 0.022 1.6 0.050
51.40 67.66 16.26 1.507 0.128 0.214 6.730 0.196
including 51.97 52.68 0.71 0.360 0.070 0.117 1.900 0.034
including 56.99 58.51 1.52 0.891 0.007 0.012 2.900 0.104
including 58.51 58.87 0.36 11.218 0.118 0.197 40.30 2.592
including 59.91 60.04 0.13 1.092 0.005 0.008 5.000 0.019
including 60.04 61.31 1.27 1.334 0.004 0.007 10.30 0.144
including 61.89 62.49 0.60 5.151 0.035 0.058 33.10 0.645
including 62.49 63.34 0.85 1.186 0.047 0.078 12.90 0.080
including 64.62 66.14 1.52 2.927 0.667 1.113 16.60 0.217
including 66.14 67.66 1.52 4.862 0.534 0.891 8.00 0.359
69.48 69.63 0.15 0.487 0.002 0.003 1.80 0.021
85.37 85.59 0.22 1.044 0.000 0.003 2.20 0.048
96.62 108.68 12.06 0.437 0.042 0.070 2.674 0.099
including 97.64 97.88 0.24 1.363 0.004 0.007 9.00 0.109
including 98.14 99.66 1.52 0.553 0.041 0.068 3.80 0.051
including 99.66 101.18 1.52 0.300 0.024 0.040 1.90 0.025
including 102.71 104.23 1.52 0.400 0.005 0.008 2.90 0.036
including 104.23 105.76 1.53 0.692 0.053 0.088 3.80 0.048
including 105.76 106.87 1.11 0.209 0.009 0.015 3.80 0.704
including 106.87 107.42 0.55 1.237 0.378 0.631 2.40 41.60
including 107.42 108.50 1.08 0.337 0.079 0.132 0.90 0.018
including 107.42 108.50 0.18 0.348 0.002 0.003 0.80 0.017
110.24 111.86 1.62 0.504 0.039 0.065 7.40 0.215

*The angle between the core axis and veins were all at an inclined angle and so widths are not true widths

Core in each the sampled intervals was split, with one half submitted for analysis and one half retained for subsequent analysis. The core was submitted to Acme Analytical Laboratory Ltd in Vancouver, BC for Group 1DX analysis. Samples returning in excess of 10,000 ppm copper were re-submitted for Group 7AR analysis. The sample that returned in excess of 10% copper was re-submitted for Group 7AR.1 re-analysis. Samples that returned Mo results greater than 2,000 ppm were re-submitted for Group 7KP - 0.50 gm analysis.

1 - Only single sample intervals having copper values greater than 0.3% were reported for Hole 18 in the table above.

2 - Conversion factor from Mo to MoS2 is 1.6681.

Further sampling of the core from Hole 18 is being undertaken to assess background and lower grade mineralization in the intervals between those reported above. As a result, the 16.26 m (53.35 foot) high grade (1.5% Cu, 0.128% Mo) interval between 51.40 and 67.66 is expected to be extended over a larger composite width (with a corresponding reduction in grade) so as to identify a composite width returning an average copper grade in excess of an arbitrary cut-off of 0.2%.

Initial visual observations of the drill core returned from the 2008 program has documented a greater proportion of both molybdenum and bornite relative to chalcopyrite in comparison to the 2006 program. Trace to minor bornite was noted in the core from the 2006 program. In contrast, bornite has been documented in virtually every hole completed in 2008. Furthermore, fracture coatings and thin veinlets comprised exclusively of bornite have been documented in several of the holes, particularly the recent holes completed in the past week. The apparent increase in bornite content, particularly the presence of veins comprised dominantly to exclusively of bornite, is interpreted to indicate proximity to a relatively high grade copper-bearing portion of the host porphyry.

In addition, molybdenum was documented in several holes from 2006, however, its erratic occurrence was interpreted to indicate a possible mineral zonation between chalcopyrite and molybdenite. In contrast, moderately to highly anomalous molybdenum has been visually and, in the case of holes 17 and 18, analytically documented in the 2008 drill holes. Molybdenum grades to 0.667% Mo (1.113% MoS2) have been documented over single samples widths of 1.52 metres, with a grade of 0.128 over 16.26 metres.

Finally, elevated to highly anomalous analytical results for both silver and gold were also documented in 2006 but due to their highly erratic values were not reported. Although there is considerable variation in analytical results over a composite width (see preceding table), it is evident that values are moderately to very highly anomalous.

Management is very excited with these preliminary results from the first two holes drilled in 2008 to test the IP anomaly. Furthermore, management believes these results are very encouraging as they confirm sub-surface mineralization as documented by previous drill results, although at higher grades, with highly anomalous, multi-element values over relatively thick intervals. Preliminary interpretation of visual and initial quantitative analytical sub-surface drill results are interpreted to support a generally north-south trend to mineralization, as documented by surface soils and the Induced Potential (IP) geophysical survey completed in 2006.

Drilling to date has utilized the existing road network, with all holes drilled on a predominantly north-south access road to the drill area. The structural control to mineralization is interpreted to dip moderately to steeply to the west. Holes IS-08-17 and 18 were drilled east of the anomaly at both a moderate (-45) and steep (-60) inclination to the coincident surface soil and IP anomaly. As a result, the overall grade is interpreted to be reduced due to dilution incurred by a drill intercept at a shallow to moderate angle to the fractures controlling (hosting) mineralization. Holes drilled on the west side of the coincident anomaly are expected to return a greater vein (mineralized fracture) density with coincident higher grades.

Management is unreservedly encouraged by these initial results of the 2008 field program, confirming surface soil and IP survey results. Further drilling has been completed, and continues, on the property as part of the 2008 field season and will be reported as further results are received.

This news release has been prepared by Richard T. Walker, B.Sc., M.Sc., P. Geo., the “Qualified Person” under National Instrument 43-101.

For further information contact:
Gordon F. Dixon, Q.C., President, Jasper Mining Corporation
Telephone (403) 297-9480, Fax (403) 266-1487,
email: xon@telus.net or visit Jasper’s website at www.jaspermining.com
Investor Relations inquiries may be directed to Robert Rowell, Telephone (403) 668-4880, email: ir@beaumontcapital.ca

- 30 -

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.