To view this news release in PDF form please Click Here

All News Releases and Filing
Please visit www.sedar.com for a complete list of Jasper's news releases.

News Releases
Click on any of the news releases below to view them in PDF:

September 25, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $111,000

September 4, 2008:
JASPER MINING CORPORATION - INITIAL DRILL RESULTS FROM 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

September 2, 2008:
JASPER MINING CORPORATION AMENDS EXPIRATION DATE OF SHARE OPTION GRANTS

August 28, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM AND TUNGSTEN RESULTS FROM MCFARLANE PROPERTY

August 21, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $1,200,000 WITH ANACORT CAPITAL INC.

July 23, 2008:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

July 11, 2008:
JASPER MINING CORPORATION CONTINUES TO ANNOUNCE HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

July 8, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $2,600,000.00 WITH MINERALFIELDS

July 2, 2008:
JASPER MINING CORPORATION COMMENCES 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

June 24, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM THREE MORE HOLES ON MCFARLANE PROPERTY

June 20, 2008:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF RESULTS TO DATE ON MCFARLANE PROPERTY

May 29, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE
MOLYBDENUM RESULTS FROM FOUR MORE HOLES ON MCFARLANE
PROPERTY

May 26, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY

May 6, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY AND SOME CORRECTIONS TO THE PRESS RELEASE OF MAY 2, 2008

May 2, 2008:
JASPER MINING CORPORATION ANNOUNCES HIGH GRADE ANALYTICAL RESULTS FROM DRILL PROGRAM ON MCFARLANE PROPERTY

April 11, 2008:
JASPER MINING CORP. COMPLETES $21,000 NON-BROKERED FINANCING

April 8, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

April 4, 2008:
JASPER MINING CORP. COMPLETES $133,000 NON-BROKERED FINANCING

April 2, 2008:
JASPER MINING CORPORATION TO RAISE AN ADDITIONAL $21,000

March 12, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

March 7, 2008:
JASPER MINING CORPORATION TO RAISE $133,000

March 4, 2008:
JASPER MINING CORP. COMPLETES $367,500 NON-BROKERED FINANCING

Febuary 25, 2008:
JASPER MINING CORPORATION TO RAISE $367,500

January 21, 2008:
JASPER MINING CORPORATION INITIATES IP GEOPHYSICAL PROGRAM
AND FURTHER DRILLING ON MCFARLANE PROPERTY

December 19, 2007:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

December 11, 2007:
JASPER MINING CORPORATION CONTINUES DRILL PROGRAM ON MCFARLANE PROPERTY

December 6, 2007:
JASPER MINING CORPORATION CLOSES $150,000 PRIVATE PLACEMENT

November 19, 2007:
JASPER MINING CORPORATION COMMENCES FOLLOW-UP DRILL PROGRAM ON MCFARLANE PROPERTY

November 5, 2007:
JASPER MINING CORPORATION CLOSES $700,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 26, 2007:
JASPER MINING CORPORATION CLOSES $2,800,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 25, 2007:
JASPER MINING CORPORATION ANNOUNCES FOLLOW-UP EXPLORATION PROGRAM FOR MCFARLANE PROPERTY

October 5, 2007:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $3,500,000.00 WITH MINERALFIELDS

September 19, 2007:
FINAL SOIL RESULTS FROM ERIE CREEK PROPERTY

August 9, 2007:
PROSPECTING RESULTS FROM McFARLANE PROPERTY

July 12, 2007:
MANAGEMENT DISCUSSION ON LATEST HIGH GRADE MOLYBDENUM RESULTS FROM McFARLANE PROPERTY; 0.889% Mo OVER 7.3 M.

July 4, 2007:
JASPER MINING CORPORATION ANNOUNCES A HIGH GRADE MOLYBDENUM INTERVAL OF 7.3 METRES GRADING 0.889% MOLYBDENUM ON THE McFARLANE PROPERTYK

June 28, 2007:
JASPER MINING CORPORATION ANNOUNCES FURTHER RESULTS; ADDITIONAL DRILLING ON ERIE CREEK

May 28, 2007:
JASPER MINING CORPORATION DRILLS MULTIPLE HOLES CONTAINING MOLYBDENUM, COPPER AND TUNGSTEN AT ERIE CREEK

May 15, 2007:
JASPER MINING CORPORATION MOBILIZES DIAMOND DRILL ONTO McFARLANE PROPERTY

April 27, 2007:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM ERIE CREEK PROPERTY

April 9, 2007:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF
RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 27, 2007:
JASPER MINING CORPORATION - DIAMOND DRILL RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 9, 2007:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL TENURES BETWEEN LYDY AND MCFARLANE PROPERTIES

February 16, 2007:
JASPER MINING CORPORATION MOBILIZES ON TO ERIE CREEK PROPERTY

February 9, 2007:
JASPER MINING CORPORATION DISCUSSION OF SOIL RESULTS FROM ERIE CREEK PROPERTY AND THE ADDITION OF 5 MINERAL TENURES

January 23, 2007:
JASPER MINING CORPORATION 2007 UPDATE

December 21, 2006:
JASPER MINING CORP COMPLETES $50,000.00 NON-BROKERED FINANCING

December 14, 2006:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION ON RESULTS OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 12, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION
OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 11, 2006:
JASPER MINING CORPORATION TO RAISE $50,000.00 BY WAY OF PRIVATE PLACEMENT

November 29, 2006:
JASPER MINING CORPORATION ANNOUNCES SOIL RESULTS FROM ERIE CREEK PROPERTY

November 10, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

November 1, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL McFARLANE CELLS

October 25, 2006:
JASPER MINING CORPORATION COMMENCES IP GEOPHYSICAL SURVEY ON ISINTOK PROPERTY

October 18, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS FROM
DIAMOND DRILL PROGRAM ON IRONY PROPERTY

October 17, 2006:
JASPER MINING CORPORATION CONTINUES DIAMOND DRILLING ON ISINTOK PROPERTY

September 29, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SAWYER PROPERTY

September 28, 2006:
JASPER MINING CORPORATION DISCUSSION OF RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 26, 2006:
JASPER MINING CORPORATION ANNOUNCES FINAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 6, 2006:
JASPER MINING CORPORATION ANNOUNCES AIRBORNE GEOPHYSICAL RESULTS FROM STORM KING PROPERTY

September 5, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SANCA PROPERTY

September 5, 2006:
JASPER MINING CORPORATION COMMENCES DIAMOND DRILL PROGRAM ON IRONY PROPERTY

August 29, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

August 28, 2006:
JASPER MINING CORPORATION ANNOUNCES ADDITIONAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 11, 2006:
JASPER MINING CORPORATION ANNOUNCES CORRECTION ON INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 10, 2006:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 3, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON McFARLANE PROPERTY

August 1, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON LYDY PROPERTY

June 26, 2006:
JASPER MINING CORPORATION ANNOUNCES COMMENCEMENT OF AEROQUEST AIRBORNE GEOPHYSICAL SURVEY ON CRETACEOUS GRANITE PROJECT

June 6, 2006:
JASPER MINING CORPORATION - MANAGEMENT SPECULATION REGARDING RESULTS OF RECENT GEOPHYSICAL SURVEY ON IRONY PROPERTY

June 1, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON IRONY PROPERTY

May 30, 2006:
JASPER MINING ANNOUNCES MOBILIZATION OF DRILL ONTO MCFARLANE PROPERTY

May 9, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

May 5, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON PROXIMAL PROPERTY AND ACQUISITION OF ADDITIONAL MINERAL TENURE

April 28, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

April 24, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL ISINTOK CELLS

JASPER MINING CORPORATION
1020, 833 - 4TH AVENUE S.W.
CALGARY, ALBERTA, T2P 3T5
TELEPHONE: (403) 297-9480, FAX: (403) 266-1487

September 29, 2008
Trading Symbol: JSP (TSX-V)
News Release No. 08-197

NEWS RELEASE

JASPER MINING CORPORATION MORE HIGH GRADE RESULTS FROM ISINTOK PROPERTY

Jasper Mining Corporation (the “Company”) has received further analytical results from its 100% owned Isintok property. The property comprises approximately 2,839 ha (7,015 acres or approximately 11.0 square miles), covering the drainage divide between McNulty and Isintok creeks. The property is located west of the Okanagan Valley in south-central British Columbia, approximately 27 km west-southwest of Summerland and 20 km north of Hedley.

Hole IS-08-47 is currently being drilled as part of the Company’s continued program to evaluate sub-surface mineralization corresponding to coincident surface soil and Induced Potential anomalies.

The results from Hole 26 are from the last hole drilled on the east flank of the coincident anomaly, which was drilled toward the west into mineralization controlled by steeply, generally west dipping structures. As a result, the hole is interpreted to have been drilled sub-parallel to the controlling structure which has the result of diluting the vein density while exaggerating the thickness of any mineralized interval. Management believes the overall result has been essentially a trade-off as visual results from multiple holes drilled on the western side of the coincident anomaly are tentatively interpreted to indicate similar (and potentially better) overall grades. However, management would like to emphasize that this is an entirely empirical observation at this point, subject to confirmation through analytical results expected over the next several weeks.

Management also wishes to emphasize the point that while the project is currently being evaluated as a Cu - Mo porphyry deposit, numerous very high grade molybdenum intercepts have been documented, with single sample intervals to 3.985% Mo (6.647% MoS2) over 0.32 m and composite intervals grading 0.055% Mo (0.092% MoS2) over 44.58 m. Local high grade values for silver (40.30 g/t over 1.18 m), Au (2.591 g/t over 1.18 m) and tungsten (0.442% over 0.86 m) have also been documented.

The following table is a compilation of high grade analytical results for copper +/- molybdenum +/-
silver +/- gold for hole (IS-08-26)
.

Hole
Number
From
(m)
To
(m)
Width
(m)
Cu
(%)
Mo
(%)
MoS21
(%)
Ag
(g/t)
Au
(g/t)
IS-08-26 45.11 69.49 24.38 0.073 0.005 0.009 0.23 0.011
including 45.73 46.96 1.23 0.558 0.010 0.017 0.90 0.047
including 49.67 51.20 1.53 0.281 0.005 0.008 1.20 0.046
including 52.82 54.25 1.43 0.198 0.042 0.070 0.90 0.010
78.64 87.78 9.14 0.479 0.215 0.359 2.15 0.121
including 81.24 82.49 1.25 0.204 0.103 0.172 1.10 0.011
including 82.49 83.63 1.14 3.031 0.727 1.213 10.0 0.138
including 83.63 84.58 0.95 0.157 0.021 0.035 0.80 0.013
including 84.58 85.45 0.87 0.374 1.131 1.887 5.50 0.969
89.12 90.80 1.68 0.267 0.002 0.003 2.00 0.028
115.67 144.72 26.97 0.065 0.009 0.014 0.65 0.015
including 124.36 125.91 1.55 0.105 0.011 0.018 0.90 0.016
including 125.91 127.40 1.49 0.106 0.024 0.040 1.10 0.033
including 130.45 131.93 1.48 0.124 0.009 0.015 1.10 0.039
including 141.12 142.64 1.52 0.103 0.011 0.018 1.20 0.029
144.21 144.72 0.51 0.107 0.005 0.008 1.10 0.013
148.51 152.17 3.66 0.102 0.007 0.011 1.59 0.037
including 151.78 152.17 0.39 0.173 0.001 0.002 2.80 0.136

*The angle between the core axis and veins were all at an inclined angle and so widths are not true widths

Core in each of the sampled intervals was split, with one half submitted for analysis and one half retained for subsequent analysis. The core was submitted to Acme Analytical Laboratory Ltd in Vancouver, BC for Group 1DX analysis. Samples returning in excess of 10,000 ppm copper were re-submitted for Group 7AR analysis. Samples that returned Mo results greater than 2,000 ppm were re-submitted for Group 7KP - 0.50 gm analysis.

1 - Conversion factor from Mo to MoS2 is 1.6681.

To date, core sampling has emphasized both visually high grade intervals and thicker mineralized zones within holes evaluated to date. Further sampling will be undertaken on each hole reported in the future so as complete sampling over the entire length of the core recovered. As such, the relatively short, high grade intercepts documented to date will be incorporated into thicker composite intervals, with both a reduction in overall grade and a corresponding increase in mineralized thickness.

An initial copper equivalency calculation utilizes current prices and assumes 100% recovery for all metals. As a result, the resulting copper equivalency values are presented herein solely for discussion purposes. Further work will be undertaken on the copper equivalency equation so as to produce more meaningful values in future releases.

Preliminary copper equivalency (Cu. EQ.) results are presented in the following table:

Hole
Number
From
(m)
To
(m)
Width
(m)
Cu. EQ.1
(%)
IS-08-26 45.11 69.49 24.38 0.158
78.64 87.78 9.14 3.876
115.67 142.64 26.97 0.208
148.51 152.17 3.66 0.228
1 - The equation used to calculate the copper equivalent is as follows:

Cu. EQ (%) = ((Cu(%)*20* $Cu) + ((Mo%*20*1.5*$MoO3)) + ((Ag*($Ag/34.2857)) + (Au*($Au/34.2857)))/(20*$Cu) where $Cu = $3.26/lb, $MoO3 = $33.75/lb, Ag = $13.18/oz and Au = $802.50/oz. Note: The resulting Cu. EQ. value assumes 100% recovery of all metals. Furthermore, the values utlized for the metals was taken from the September 8 - 14 Northern Miner and so does not address expected trends in metal prices.

Management continues to be very excited by high grade results from the Isintok property. Management is very encouraged by additonal results as they continue to confirm sub-surface mineralization, at higher grades, documented by previous drill programs.

The 2008 sampling program extended the linear soil anomaly approximately 3 km northwest, with a second linear soil anomaly extending approximately 1.5 km west. As a result, the overall surface soil anomaly defined is approximately 4.2 km in length, generally oriented northwest - southeast, and up to 1 km in width. A second 1.5 km long linear surface soil anomaly extends to the west from the area of current drilling, localized in the southern third of the overall soil anomaly. The Chargeability anomaly defined by the 2006 Induced Potential survey, coincides with the initial surface soil anomaly defined in 2006. This coincidence of the surface soil and Chargeability anomalies, together with sub-surface mineralization subsequently confirmed through diamond drilling, is interpreted to indicate analogous mineralization associated with the overall Cu-Mo-W surface soil anomaly defined by soils recovered between 2006 and 2008. Management believes the surface soil anomaly defined, taken together with locally coincident IP results and sub-surface mineralization identified through drilling, represents potential for a considerable increase to the size of the overall mineralized system.

This news release has been prepared by Richard T. Walker, B.Sc., M.Sc., P. Geo., the “Qualified Person” under National Instrument 43-101.

For further information contact:
Gordon F. Dixon, Q.C., President, Jasper Mining Corporation
Telephone (403) 297-9480, Fax (403) 266-1487,
email: xon@telus.net or visit Jasper’s website at www.jaspermining.com
Investor Relations inquiries may be directed to Robert Rowell, Telephone (403) 668-4880, email: ir@beaumontcapital.ca

- 30 -

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.