To view this news release in PDF form please Click Here

All News Releases and Filing
Please visit www.sedar.com for a complete list of Jasper's news releases.

News Releases
Click on any of the news releases below to view them in PDF:

October 28, 2008:
JASPER MINING CORPORATION MORE HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

October 27, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $2,500,000 BY THE ISSUANCE OF FLOW-THROUGH SHARES

October 20, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

October 15, 2008:
JASPER MINING CORPORATION
REPORTS DISCOVERY HOLE FROM ISINTOK PROPERTY 94.67 M GRADING 0.086% CU AND 0.015% MO (0.026% MOS2)

September 29, 2008:
JASPER MINING CORPORATION CLOSES $1,179,040 PRIVATE PLACEMENT WITH ANACORT CAPITAL INC.

September 29, 2008:
JASPER MINING CORPORATION MORE HIGH GRADE RESULTS FROM ISINTOK PROPERTY

September 25, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $111,000

September 4, 2008:
JASPER MINING CORPORATION - INITIAL DRILL RESULTS FROM 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

September 2, 2008:
JASPER MINING CORPORATION AMENDS EXPIRATION DATE OF SHARE OPTION GRANTS

August 28, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM AND TUNGSTEN RESULTS FROM MCFARLANE PROPERTY

August 21, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $1,200,000 WITH ANACORT CAPITAL INC.

July 23, 2008:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

July 11, 2008:
JASPER MINING CORPORATION CONTINUES TO ANNOUNCE HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

July 8, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $2,600,000.00 WITH MINERALFIELDS

July 2, 2008:
JASPER MINING CORPORATION COMMENCES 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

June 24, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM THREE MORE HOLES ON MCFARLANE PROPERTY

June 20, 2008:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF RESULTS TO DATE ON MCFARLANE PROPERTY

May 29, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE
MOLYBDENUM RESULTS FROM FOUR MORE HOLES ON MCFARLANE
PROPERTY

May 26, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY

May 6, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY AND SOME CORRECTIONS TO THE PRESS RELEASE OF MAY 2, 2008

May 2, 2008:
JASPER MINING CORPORATION ANNOUNCES HIGH GRADE ANALYTICAL RESULTS FROM DRILL PROGRAM ON MCFARLANE PROPERTY

April 11, 2008:
JASPER MINING CORP. COMPLETES $21,000 NON-BROKERED FINANCING

April 8, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

April 4, 2008:
JASPER MINING CORP. COMPLETES $133,000 NON-BROKERED FINANCING

April 2, 2008:
JASPER MINING CORPORATION TO RAISE AN ADDITIONAL $21,000

March 12, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

March 7, 2008:
JASPER MINING CORPORATION TO RAISE $133,000

March 4, 2008:
JASPER MINING CORP. COMPLETES $367,500 NON-BROKERED FINANCING

Febuary 25, 2008:
JASPER MINING CORPORATION TO RAISE $367,500

January 21, 2008:
JASPER MINING CORPORATION INITIATES IP GEOPHYSICAL PROGRAM
AND FURTHER DRILLING ON MCFARLANE PROPERTY

December 19, 2007:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

December 11, 2007:
JASPER MINING CORPORATION CONTINUES DRILL PROGRAM ON MCFARLANE PROPERTY

December 6, 2007:
JASPER MINING CORPORATION CLOSES $150,000 PRIVATE PLACEMENT

November 19, 2007:
JASPER MINING CORPORATION COMMENCES FOLLOW-UP DRILL PROGRAM ON MCFARLANE PROPERTY

November 5, 2007:
JASPER MINING CORPORATION CLOSES $700,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 26, 2007:
JASPER MINING CORPORATION CLOSES $2,800,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 25, 2007:
JASPER MINING CORPORATION ANNOUNCES FOLLOW-UP EXPLORATION PROGRAM FOR MCFARLANE PROPERTY

October 5, 2007:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $3,500,000.00 WITH MINERALFIELDS

September 19, 2007:
FINAL SOIL RESULTS FROM ERIE CREEK PROPERTY

August 9, 2007:
PROSPECTING RESULTS FROM McFARLANE PROPERTY

July 12, 2007:
MANAGEMENT DISCUSSION ON LATEST HIGH GRADE MOLYBDENUM RESULTS FROM McFARLANE PROPERTY; 0.889% Mo OVER 7.3 M.

July 4, 2007:
JASPER MINING CORPORATION ANNOUNCES A HIGH GRADE MOLYBDENUM INTERVAL OF 7.3 METRES GRADING 0.889% MOLYBDENUM ON THE McFARLANE PROPERTYK

June 28, 2007:
JASPER MINING CORPORATION ANNOUNCES FURTHER RESULTS; ADDITIONAL DRILLING ON ERIE CREEK

May 28, 2007:
JASPER MINING CORPORATION DRILLS MULTIPLE HOLES CONTAINING MOLYBDENUM, COPPER AND TUNGSTEN AT ERIE CREEK

May 15, 2007:
JASPER MINING CORPORATION MOBILIZES DIAMOND DRILL ONTO McFARLANE PROPERTY

April 27, 2007:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM ERIE CREEK PROPERTY

April 9, 2007:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF
RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 27, 2007:
JASPER MINING CORPORATION - DIAMOND DRILL RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 9, 2007:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL TENURES BETWEEN LYDY AND MCFARLANE PROPERTIES

February 16, 2007:
JASPER MINING CORPORATION MOBILIZES ON TO ERIE CREEK PROPERTY

February 9, 2007:
JASPER MINING CORPORATION DISCUSSION OF SOIL RESULTS FROM ERIE CREEK PROPERTY AND THE ADDITION OF 5 MINERAL TENURES

January 23, 2007:
JASPER MINING CORPORATION 2007 UPDATE

December 21, 2006:
JASPER MINING CORP COMPLETES $50,000.00 NON-BROKERED FINANCING

December 14, 2006:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION ON RESULTS OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 12, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION
OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 11, 2006:
JASPER MINING CORPORATION TO RAISE $50,000.00 BY WAY OF PRIVATE PLACEMENT

November 29, 2006:
JASPER MINING CORPORATION ANNOUNCES SOIL RESULTS FROM ERIE CREEK PROPERTY

November 10, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

November 1, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL McFARLANE CELLS

October 25, 2006:
JASPER MINING CORPORATION COMMENCES IP GEOPHYSICAL SURVEY ON ISINTOK PROPERTY

October 18, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS FROM
DIAMOND DRILL PROGRAM ON IRONY PROPERTY

October 17, 2006:
JASPER MINING CORPORATION CONTINUES DIAMOND DRILLING ON ISINTOK PROPERTY

September 29, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SAWYER PROPERTY

September 28, 2006:
JASPER MINING CORPORATION DISCUSSION OF RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 26, 2006:
JASPER MINING CORPORATION ANNOUNCES FINAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 6, 2006:
JASPER MINING CORPORATION ANNOUNCES AIRBORNE GEOPHYSICAL RESULTS FROM STORM KING PROPERTY

September 5, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SANCA PROPERTY

September 5, 2006:
JASPER MINING CORPORATION COMMENCES DIAMOND DRILL PROGRAM ON IRONY PROPERTY

August 29, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

August 28, 2006:
JASPER MINING CORPORATION ANNOUNCES ADDITIONAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 11, 2006:
JASPER MINING CORPORATION ANNOUNCES CORRECTION ON INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 10, 2006:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 3, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON McFARLANE PROPERTY

August 1, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON LYDY PROPERTY

June 26, 2006:
JASPER MINING CORPORATION ANNOUNCES COMMENCEMENT OF AEROQUEST AIRBORNE GEOPHYSICAL SURVEY ON CRETACEOUS GRANITE PROJECT

June 6, 2006:
JASPER MINING CORPORATION - MANAGEMENT SPECULATION REGARDING RESULTS OF RECENT GEOPHYSICAL SURVEY ON IRONY PROPERTY

June 1, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON IRONY PROPERTY

May 30, 2006:
JASPER MINING ANNOUNCES MOBILIZATION OF DRILL ONTO MCFARLANE PROPERTY

May 9, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

May 5, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON PROXIMAL PROPERTY AND ACQUISITION OF ADDITIONAL MINERAL TENURE

April 28, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

April 24, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL ISINTOK CELLS

JASPER MINING CORPORATION
1020, 833 - 4TH AVENUE S.W.
CALGARY, ALBERTA, T2P 3T5
TELEPHONE: (403) 297-9480, FAX: (403) 266-1487

November 3, 2008
Trading Symbol: JSP (TSX-V)
News Release No. 08-203

NEWS RELEASE

JASPER MINING CORPORATION - FURTHER HIGH GRADE
RESULTS FROM DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY

Jasper Mining Corporation (the “Company”) has received analytical results from the bottom of hole 36, together with additional infill sampling for two holes previously released from its 100% owned Isintok property. The property comprises approximately 2,839 ha (7,015 acres or approximately 11.0 square miles), covering the drainage divide between McNulty and Isintok creeks. The property is located west of the Okanagan Valley in south-central British Columbia, approximately 27 km west-southwest of Summerland and 20 km north of Hedley.

Hole IS-08-54 was the final hole drilled for the Company’s highly successful 2008 exploration program, bringing to 38 the total number of diamond drill holes completed to date as part of the 2008 exploration program, in addition to the intial16 hole drill program completed during the 2006 field season. The holes continue the Company’s evaluation of sub-surface mineralization corresponding to coincident surface soil and Induced Potential anomalies.

Hole 36 was drilled along the west flank of the coincident anomaly, oriented eastward into mineralization controlled by steeply, generally west dipping structures. As a result, it is interpreted to have been drilled at a moderate angle to the controlling structures.

Results for holes 19 and 20 were previously released (see News Release dated September 18, 2008), however, additional sampling has been completed so as to sample the complete mineralized intervals reported herein. Holes 19 and 20 were drilled on the east flank of the coincident anomaly, with the holes directed to the west.

Management also wishes to emphasize the point that while the project is currently being evaluated as a Cu - Mo porphyry deposit, numerous very high grade molybdenum intercepts have been documented, with single sample intervals to 3.985% Mo (6.647% MoS2) over 0.32 m and composite intervals grading 0.055% Mo (0.092% MoS2) over 44.58 m. Local high grade values for silver (40.30 g/t over 1.18 m), Au (2.591 g/t over 1.18 m) and tungsten (0.25% over 1.12 m) have also been documented.

The following table is a compilation of high grade analytical results for copper +/- molybdenum +/- silver +/- gold for holes (IS-08-19, 20 and lower part of 36).

Hole
Number
From
(m)
To
(m)
Width*
(m)
Cu2
(%)
Mo
(%)
MoS23
(%)
Ag
(g/t)
Au
(g/t)
IS-08-19 48.44 126.70 78.26 0.137 0.034 0.056 1.02 0.033
including 49.26 49.79 0.53 0.847 0.078 0.131 3.9 0.145
including 51.79 52.21 0.72 0.384 0.036 0.060 2.9 0.240
including 58.29 58.59 0.30 0.295 0.166 0.277 3.2 0.081
including 58.59 58.90 0.31 0.128 0.001 0.002 2.0 0.030
including 58.90 59.14 0.24 0.980 0.005 0.008 7.7 0.206
including 60.04 61.34 1.34 0.136 0.003 0.005 2.0 0.044
including 63.01 107.59 44.581 0.171 0.055 0.092 1.3 0.044
including 63.01 63.47 0.46 0.429 0.015 0.025 8.2 0.184
including 65.12 65.47 0.35 0.397 0.071 0.118 5.6 0.110
including 65.47 66.14 0.67 0.209 0.008 0.013 2.8 0.088
including 69.19 70.71 1.52 0.727 0.104 0.173 5.8 0.166
including 70.71 72.23 1.52 0.530 0.051 0.085 7.2 0.219
including 77.04 77.32 0.28 0.503 0.013 0.022 2.1 0.008
including 81.38 82.90 1.52 0.255 0.187 0.312 1.0 0.004
including 90.52 92.04 1.52 0.331 0.004 0.007 1.4 0.012
including 101.02 101.34 0.32 0.265 3.985 6.647 6.3 0.024
including 103.90 104.14 0.24 0.868 0.001 0.002 4.1 0.024
including 107.29 107.59 0.30 0.465 1.306 2.178 6.6 2.684
IS-08-20 25.78 57.82 31.27 0.069 0.019 0.031 0.90 0.020
including 27.20 27.54 0.34 0.418 0.001 0.002 4.4 0.055
including 27.70 28.05 0.35 0.524 0.005 0.008 3.5 0.308
including 33.37 33.68 0.31 0.877 0.011 0.018 9.8 0.252
including 37.63 37.72 0.09 0.230 0.000 0.000 4.0 0.026
including 44.35 45.11 0.76 0.455 0.055 0.092 5.0 0.077
including 46.11 46.66 0.55 0.161 0.002 0.004 2.2 0.017
including 46.66 48.16 1.50 0.152 0.343 0.572 2.1 0.034
52.72 54.25 1.53 0.134 0.000 0.000 0.8 0.006
57.30 57.82 0.52 0.127 0.002 0.004 0.8 0.015
93.87 105.46 11.59 0.096 0.034 0.056 0.4 0.010
including 94.30 94.89 0.59 0.690 0.645 1.076 3.0 0.063
140.82 141.75 0.93 0.006 0.050 0.083 0.1 0.000
141.75 142.00 0.25 0.004 0.096 0.160 0.0 0.000
152.26 152.85 0.59 0.080 0.636 1.121 1.6 0.021
204.41 210.02 5.61 0.491 0.002 0.004 6.1 0.117
including 205.12 206.64 1.52 0.636 0.004 0.007 7.3 0.090
including 206.64 208.14 1.50 0.649 0.002 0.003 8.2 0.271
including 208.14 209.69 1.55 0.379 0.000 0.000 4.7 0.048
259.99 261.51 1.52 0.340 0.000 0.000 4.0 0.048
278.43 278.88 0.45 0.083 0.123 0.205 0.6 0.017
278.43 281.21 2.78 0.081 0.173 0.289 0.6 0.016
including 280.33 280.84 0.51 0.189 0.371 0.619 1.0 0.010
including 280.84 281.21 0.37 0.175 0.603 1.006 1.3 0.067
IS-08-363 96.99 193.49 96.50 0.065 0.010 0.017 0.47 0.010
including 121.40 165.31 43.91 0.104 0.014 0.024 0.62 0.014
including 118.50 119.96 1.46 0.035 0.061 0.102 0.3 0.004
including 122.39 123.44 1.05 0.202 0.004 0.007 0.6 0.001
including 127.47 127.93 0.46 0.237 0.031 0.052 1.5 0.042
including 132.12 132.41 0.29 2.052 0.019 0.032 4.1 0.048
including 133.17 133.41 0.24 0.322 0.163 0.272 2.4 0.105
including 134.34 135.66 1.32 0.107 0.012 0.020 0.3 0.010
including 135.66 136.78 1.12 0.298 0.023 0.038 1.4 0.024
including 136.78 137.46 0.68 0.123 0.006 0.010 0.5 0.007
including 137.46 138.98 1.52 0.114 0.007 0.012 0.4 0.004
including 138.98 140.32 1.34 0.158 0.010 0.017 0.6 0.014
including 140.32 141.70 1.38 0.160 0.020 0.033 0.7 0.006
including 143.31 144.92 1.61 0.127 0.153 0.255 0.4 0.002
including 146.51 148.13 1.62 0.125 0.005 0.008 0.8 0.033
including 148.13 149.65 1.52 0.125 0.008 0.013 1.0 0.022
including 151.17 152.67 1.50 0.138 0.010 0.017 1.8 0.041
including 164.87 165.31 0.44 0.115 0.006 0.010 1.0 0.041
including 167.56 168.18 0.62 0.131 0.004 0.007 1.0 0.041
including 186.11 187.42 1.31 0.135 0.004 0.007 1.4 0.028

*The angle between the core axis and veins were all at an inclined angle and so widths are not true widths

Core in each of the sampled intervals was split, with one half submitted for analysis and one half retained for subsequent analysis. The core was submitted to Acme Analytical Laboratory Ltd in Vancouver, BC for Group 1DX analysis. Samples returning in excess of 10,000 ppm copper were re-submitted for Group 7AR analysis. Samples that returned Mo results greater than 2,000 ppm were re-submitted for Group 7KP - 0.50 gm analysis.

1 - Only single sample intervals having copper values greater than 0.3% were reported for Hole 19 in the table above.
2 - Conversion factor from Mo to MoS2 is 1.6681.
3 - Results for the lower portion of the hole

The additional sampling for holes 19 and 20 allowed determination of thicker mineralized intervals, as reported above. In addition, the results for Hole 36 are only those for the lower portion of the hole, as the results for samples 1 to 85 remain outstanding.

The intent of the 2008 drill program was to document a mineralized deposit having bulk tonnage potential returning an average grade in excess of 0.2% copper. This represents a 200% increase over the objectives of the 2006 program, which reported composite intervals having an average minimum grade of 0.1% Cu. Furthermore, given the significant increase in the relative proportion of molybdenum identified in each hole, together with multiple high grade intercepts and composite intervals reported, in future management will be including a copper equivalent value and reporting intervals having a grade in excess of 0.2% copper equivalent.

An initial copper equivalency calculation utilizes current prices and assumes 100% recovery for all metals. As a result, the resulting copper equivalency values are presented herein solely for initial discussion purposes. Further work will be undertaken on the copper equivalency equation so as to produce more meaningful values in future releases.

Preliminary copper equivalency (Cu. EQ.) results are presented in the following table:

Hole
Number
From
(m)
To
(m)
Width
(m)
Cu. EQ.1
(%)
IS-08-19 48.44 126.70 78.26 0.680
IS-08-20 25.78 57.82 32.04 0.369
93.87 105.46 11.59 0.627
204.41 210.02 5.61 0.606
278.43 281.21 2.78 2.783
IS-08-36 96.99 193.49 96.50 0.229
including 121.40 165.31 43.91 0.333

1 - The equation used to calculate the copper equivalent is as follows:

Cu. EQ (%) = ((Cu(%)*20* $Cu) + ((Mo%*20*1.5*$MoO3)) + ((Ag*($Ag/34.2857)) + (Au*($Au/34.2857))) ÷ (20*$Cu)

where $Cu = $3.26/lb, $MoO3 = $33.75/lb, Ag = $13.18/oz and Au = $802.50/oz. Note: The resulting Cu. EQ. value assumes 100% recovery of all metals. Furthermore, the values utilized for the metals was taken from the September 8 - 14, 2008 Northern Miner and so does not address expected trends in metal prices.

The final holes of the 2008 program were intended as a preliminary test of the northwestern IP anomaly, having approximate dimensions 300 m north-south by 200 m east-west. The northwestern IP anomaly is separated (in map view) by an area approximately 120 m wide characterized by a low grade IP from the southern IP anomaly, which has been the focus of the 2008 drill program to date. The southern IP anomaly has a 50 m wide tail, extending approximately 400 m north-south, at which point it flairs outward to the east-northeast for approximately 150 m, resulting in an overall appearance like an inverted “L”.

Hole 52, collared midway between the two IP anomalies expressed at surface, documented a near surface dyke swarm that apparently cut out near surface mineralization. At greater depth, the hole documented mineralization visually similar to that documented to the southeast. Holes 53 and 54 represent the first holes drilled by the Company in the northwestern anomaly and both documented similar mineralization (on a visual basis) to that documented in the southern IP anomaly. Qualitatively, there appears to be a lower proportion of bornite, with similar proportions of chalcopyrite and molybdenite, in these first two holes testing the northwestern anomaly.

Hole 52 is considered to be a very important hole in that, by intersecting similar mineralization, it is interpreted to suggest sub-surface continuity in mineralization between the two IP anomalies and, therefore, significantly increase the potential size. On the basis of this interpretation, the area potentially underlain by higher grade copper + molybdenum + silver + gold +/- tungsten mineralization, as documented to date and, in particular by the 2008 results, is approximately 1.06 km north-south by up to 350 m east-west.

Management is very excited by continued high grade (Cu +/- Mo) results from drill holes completed in 2008 to test the coincident IP - soil anomaly. Management is unreservedly encouraged by continued results returned from the 2008 field program, confirming coincident surface soil and IP survey results, together with high grade, sub-surface mineralization. Drilling on the property as part of the 2008 field season has been completed, however, further analytical results will be reported as received.

This news release has been prepared by Richard T. Walker, B.Sc., M.Sc., P. Geo., the “Qualified Person” under National Instrument 43-101.

For further information contact:
Gordon F. Dixon, Q.C., President, Jasper Mining Corporation
Telephone (403) 297-9480, Fax (403) 266-1487,
email: xon@telus.net or visit Jasper’s website at www.jaspermining.com
Investor Relations inquiries may be directed to Robert Rowell, Telephone (403) 668-4880, email: ir@beaumontcapital.ca

- 30 -

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.