To view this news release in PDF form please Click Here

All News Releases and Filing
Please visit www.sedar.com for a complete list of Jasper's news releases.

News Releases
Click on any of the news releases below to view them in PDF:

May 2, 2008:
JASPER MINING CORPORATION ANNOUNCES HIGH GRADE ANALYTICAL RESULTS FROM DRILL PROGRAM ON MCFARLANE PROPERTY

April 11, 2008:
JASPER MINING CORP. COMPLETES $21,000 NON-BROKERED FINANCING

April 8, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

April 4, 2008:
JASPER MINING CORP. COMPLETES $133,000 NON-BROKERED FINANCING

April 2, 2008:
JASPER MINING CORPORATION TO RAISE AN ADDITIONAL $21,000

March 12, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

March 7, 2008:
JASPER MINING CORPORATION TO RAISE $133,000

March 4, 2008:
JASPER MINING CORP. COMPLETES $367,500 NON-BROKERED FINANCING

Febuary 25, 2008:
JASPER MINING CORPORATION TO RAISE $367,500

January 21, 2008:
JASPER MINING CORPORATION INITIATES IP GEOPHYSICAL PROGRAM
AND FURTHER DRILLING ON MCFARLANE PROPERTY

December 19, 2007:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

December 11, 2007:
JASPER MINING CORPORATION CONTINUES DRILL PROGRAM ON MCFARLANE PROPERTY

December 6, 2007:
JASPER MINING CORPORATION CLOSES $150,000 PRIVATE PLACEMENT

November 19, 2007:
JASPER MINING CORPORATION COMMENCES FOLLOW-UP DRILL PROGRAM ON MCFARLANE PROPERTY

November 5, 2007:
JASPER MINING CORPORATION CLOSES $700,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 26, 2007:
JASPER MINING CORPORATION CLOSES $2,800,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 25, 2007:
JASPER MINING CORPORATION ANNOUNCES FOLLOW-UP EXPLORATION PROGRAM FOR MCFARLANE PROPERTY

October 5, 2007:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $3,500,000.00 WITH MINERALFIELDS

September 19, 2007:
FINAL SOIL RESULTS FROM ERIE CREEK PROPERTY

August 9, 2007:
PROSPECTING RESULTS FROM McFARLANE PROPERTY

July 12, 2007:
MANAGEMENT DISCUSSION ON LATEST HIGH GRADE MOLYBDENUM RESULTS FROM McFARLANE PROPERTY; 0.889% Mo OVER 7.3 M.

July 4, 2007:
JASPER MINING CORPORATION ANNOUNCES A HIGH GRADE MOLYBDENUM INTERVAL OF 7.3 METRES GRADING 0.889% MOLYBDENUM ON THE McFARLANE PROPERTYK

June 28, 2007:
JASPER MINING CORPORATION ANNOUNCES FURTHER RESULTS; ADDITIONAL DRILLING ON ERIE CREEK

May 28, 2007:
JASPER MINING CORPORATION DRILLS MULTIPLE HOLES CONTAINING MOLYBDENUM, COPPER AND TUNGSTEN AT ERIE CREEK

May 15, 2007:
JASPER MINING CORPORATION MOBILIZES DIAMOND DRILL ONTO McFARLANE PROPERTY

April 27, 2007:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM ERIE CREEK PROPERTY

April 9, 2007:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF
RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 27, 2007:
JASPER MINING CORPORATION - DIAMOND DRILL RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 9, 2007:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL TENURES BETWEEN LYDY AND MCFARLANE PROPERTIES

February 16, 2007:
JASPER MINING CORPORATION MOBILIZES ON TO ERIE CREEK PROPERTY

February 9, 2007:
JASPER MINING CORPORATION DISCUSSION OF SOIL RESULTS FROM ERIE CREEK PROPERTY AND THE ADDITION OF 5 MINERAL TENURES

January 23, 2007:
JASPER MINING CORPORATION 2007 UPDATE

December 21, 2006:
JASPER MINING CORP COMPLETES $50,000.00 NON-BROKERED FINANCING

December 14, 2006:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION ON RESULTS OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 12, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION
OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 11, 2006:
JASPER MINING CORPORATION TO RAISE $50,000.00 BY WAY OF PRIVATE PLACEMENT

November 29, 2006:
JASPER MINING CORPORATION ANNOUNCES SOIL RESULTS FROM ERIE CREEK PROPERTY

November 10, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

November 1, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL McFARLANE CELLS

October 25, 2006:
JASPER MINING CORPORATION COMMENCES IP GEOPHYSICAL SURVEY ON ISINTOK PROPERTY

October 18, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS FROM
DIAMOND DRILL PROGRAM ON IRONY PROPERTY

October 17, 2006:
JASPER MINING CORPORATION CONTINUES DIAMOND DRILLING ON ISINTOK PROPERTY

September 29, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SAWYER PROPERTY

September 28, 2006:
JASPER MINING CORPORATION DISCUSSION OF RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 26, 2006:
JASPER MINING CORPORATION ANNOUNCES FINAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 6, 2006:
JASPER MINING CORPORATION ANNOUNCES AIRBORNE GEOPHYSICAL RESULTS FROM STORM KING PROPERTY

September 5, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SANCA PROPERTY

September 5, 2006:
JASPER MINING CORPORATION COMMENCES DIAMOND DRILL PROGRAM ON IRONY PROPERTY

August 29, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

August 28, 2006:
JASPER MINING CORPORATION ANNOUNCES ADDITIONAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 11, 2006:
JASPER MINING CORPORATION ANNOUNCES CORRECTION ON INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 10, 2006:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 3, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON McFARLANE PROPERTY

August 1, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON LYDY PROPERTY

June 26, 2006:
JASPER MINING CORPORATION ANNOUNCES COMMENCEMENT OF AEROQUEST AIRBORNE GEOPHYSICAL SURVEY ON CRETACEOUS GRANITE PROJECT

June 6, 2006:
JASPER MINING CORPORATION - MANAGEMENT SPECULATION REGARDING RESULTS OF RECENT GEOPHYSICAL SURVEY ON IRONY PROPERTY

June 1, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON IRONY PROPERTY

May 30, 2006:
JASPER MINING ANNOUNCES MOBILIZATION OF DRILL ONTO MCFARLANE PROPERTY

May 9, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

May 5, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON PROXIMAL PROPERTY AND ACQUISITION OF ADDITIONAL MINERAL TENURE

April 28, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

April 24, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL ISINTOK CELLS

JASPER MINING CORPORATION
1020, 833 - 4TH AVENUE S.W.
CALGARY, ALBERTA, T2P 3T5
TELEPHONE: (403) 297-9480, FAX: (403) 266-1487

May 6, 2008
Trading Symbol: JSP (TSX-V)
News Release No. 08-182

NEWS RELEASE

JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY AND SOME CORRECTIONS TO THE PRESS RELEASE OF MAY 2, 2008

Jasper Mining Corporation (the “Company”) has received further high grade results pertaining to the Phase II drill program on the McFarlane property. Molybdenite mineralization varies from coatings several mm thick along vein contacts, through fine- to very coarse-grained disseminations within quartz (+ pyrite +/- sericite +/- alkali feldspar) veins up to 1.6 m thick to thin (up to 2 cm thick) visually pure molybdenite veins. The vein system is interpreted to trend east-west with dip varying between steeply north and steeply south dipping. Quartz monzonite is the predominant host lithology, with overlying metasediments (metamorphosed sediments) hosting a subordinate proportion of molybdenite-bearing veins. Quartz + pyrite +/- sericite veins are relatively abundant throughout the drill core, however, vein density is highly variable.

The current high priority drill target is a vein system, consisting of up to two relatively thick molybdenite-bearing quartz veins and/or vein systems occurring between the two adits comprising the Ben Derby MINFILE occurrence. The two adits are separated by approximately 500 m map distance. The veins exposed within the adits are up to 1.5 m thick (estimated true thickness - Ben Derby adit) and generally contain highly anomalous molybdenite in association with very coarsegrained pyrite (to five cm in long dimension) and variable sericitic alteration.

A total of 56 samples in the four holes released in Table 1 below returned Mo values greater than 100 ppm. The following tabulation includes all mineralized intercepts having an analytical value in excess of 1000 ppm (0.1 %) Mo. Intervals for which an average grade has been determined for a contiguous series of multiple samples are highlighted in bold. The following Table summarizes new data received by the Company since the Press Release of May 2, 2008:

Table 1

Hole
Number
From
(m)
To
(m)
Width
(m)
Mo
(ppm)
Mo
(%)
MC-08-31
29.10
29.82
0.72
7066.4
0.707
including
29.72
29.82
0.10
46730
4.673
70.56
71.99
1.43
1813.1
0.181
including
71.57
71.80
0.23
9590
0.959
82.43
82.56
0.13
1787
0.179
MC-08-34
28.33
28.89
0.56
14400
1.440
35.20
37.08
1.88
1333.3
0.133
including
35.20
35.52
0.32
1542.8
0.154
including
35.52
36.38
0.86
1140.7
0.114
including
36.38
37.08
0.73
1474.1
0.147
45.30
48.15
2.85
3999.5
0.400
including
45.30
45.82
0.52
4680
0.468
including
45.82
47.42
1.60
2820
0.282
including
47.42
48.15
0.73
6100
0.610
MC-08-37
90.58
90.97
0.39
1724.2
0.172
129.66
130.03
0.37
1243.7
0.124
142.05
142.45
0.40
4210
0.421
MC-08-38
74.11
76.07
1.96
1435.9
0.144
including
74.11
75.05
0.94
1466.6
0.147
including
75.05
76.07
1.02
1407.7
0.141
128.56
128.88
0.32
1192.1
0.119

* Drill intercepts with veins were all at an inclined angle and so widths are not true widths

Core in each the sampled intervals was split, with one half submitted for analysis and one half retained for subsequent analysis. The core was submitted to Acme Analytical Laboratory Ltd in Vancouver, BC for Group 1DX analysis. Samples that returned Mo results greater than 2,000 ppm were re-submitted for re-analysis. Group 7KP - 0.50 gm analysis was utilized for more quantitative determination of high grade Mo results.

The intercepts in Holes 31 and 34 were drilled from the same pad as Hole 36 (see News Release dated May 2, 2008) but were drilled at different azimuths and/or inclinations. Holes 37 and 38 were drilled northwest and southwest, respectively, of the eastern adit. Hole 38 was drilled from the same pad and at the same azimuth as Hole 39 (Note: correction in Table 2 below), with Hole 38 at an inclination of -45 degrees and Hole 39 at -60 degrees. These holes were intended to
identify additional mineralized veins associated with the vein system exposed by the adit. The three pads from which the above holes were drilled are separated by approximately 180 m and are located within the overall area described in the News Release dated May 2, 2008.

In addition, the Company has recently received approval for an amendment to our Phase II program, allowing the Company to expand and continue evaluating the area interpreted to be
underlain by the molybdenite-bearing vein system. An additional 9 pads have been approved, allowing the Company both the opportunity for infill drilling and step-out drilling to the northeast.

The Company notes the following errors in the News Release issued May 2, 2008. A total of six intervals were released for which a weighted average value had been calculated. In determining the weighted average value, the total composite thickness had been provided in metres, but the corresponding calculation (undertaken in feet) omitted widths of unmineralized intervals which had not been sampled, resulting in an erroneous average value for each of composite interval. Therefore, the six intervals containing errors are composite intervals comprised of samples that
returned high grade analytical values bracketing one or more unmineralized, and therefore unsampled, intervals. Finally, the interval indicated as occurring in MC-07-36 occurs in MC-07-39. The following table contains the corrected values for each composite interval:

Table 2

Hole
Number
From
(m)
To
(m)
Width
(m)
Mo
(ppm)
Mo
(%)
MC-07-06
68.60
68.72
0.12
1292
0.129
MC-07-09
76.26
83.79
7.53
652
0.065
including
76.26
76.38
0.12
2800
0.28
including
83.70
83.79
0.09
1179
0.118
110.48
110.54
0.06
10860
1.086
110.54
110.56
0.02
2830
0.283
110.59
110.64
0.05
1597
0.160
117.20
117.27
0.07
2510
0.251
149.32
149.39
0.07
14230
1.423
149.57
149.71
0.14
1131
0.113
155.86
156.00
0.14
1622
0.162
172.18
172.48
0.30
1271.2
0.127
including
172.24
172.35
0.11
1085
0.109
including
172.24
172.48
0.06
2980
0.298
180.93
181.07
0.14
2870
0.287
181.07
181.12
0.05
6180
0.618
226.17
226.46
0.29
1112
0.111
MC-07-10
22.34
27.13
4.79
177
0.017
including
22.34
22.46
0.12
1846
0.185
including
26.70
26.88
0.18
1857
0.186
42.33
58.19
15.86
642
0.064
including
42.33
42.54
0.21
2700
0.270
including
58.10
58.19
0.09
1824
0.182
194.16
202.05
7.89
622
0.062
including
194.16
196.76
2.6
1017
0.102
including
201.91
202.05
0.14
16170
1.617
215.88
225.75
9.87
151
0.015
including
215.88
216.06
0.18
2620
0.262
including
220.96
221.13
0.17
1480
0.148
including
222.57
222.87
0.30
1038
0.104
including
225.53
225.75
0.22
1165
0.117
MC-07-13
147.00
147.10
0.10
1412.5
0.141
MC-07-18
77.50
80.29
2.79
1530.7
0.153
including
77.50
78.82
1.32
3090
0.309
96.30
96.80
0.50
1014
0.101
MC-07-36
41.97
43.00
1.03
1474
0.147
MC-07-39
77.13
83.60
6.47
80
0.008
including
77.13
77.25
0.12
2870
0.287

Drill core recovered from the program continues to be evaluated and sampled, with samples submitted for analysis to Acme Laboratories Ltd in Vancouver, BC. Quantitative analytical results will continue to be released as received and evaluated by the Company.

Jasper management is encouraged with the McFarlane drilling results and expects to have sufficient information to have an independent resource evaluation prepared for the property. The property is adjacent to and is contiguous with the Company’s Lydy property.

Together the Lydy and McFarlane properties comprise a composite property of 4,259 ha (10,524 acres), encompassing an area 11 km east-west by 4 km north-south. Both the Lydy and McFarlane properties are 100% owned by the Company with potential for molybdenum plus copper plus/minus gold mineralization.

This press release has been prepared by Richard T. Walker, B.Sc., M .Sc., P. Geo., the “Qualified Person” under National Instrument 43-101.

For further information contact:
Gordon F. Dixon, Q.C., President, Jasper Mining Corporation
Telephone (403) 297-9480, Fax (403) 266-1487,
email: xon@telus.net or visit Jasper’s website at www.jaspermining.com
Investor Relations inquiries may be directed to Robert Rowell, Telephone (403) 668-4880, email: ir@beaumontcapital.ca

- 30 -

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.