To view this news release in PDF form please Click Here

All News Releases and Filing
Please visit www.sedar.com for a complete list of Jasper's news releases.

News Releases
Click on any of the news releases below to view them in PDF:

April 11, 2008:
JASPER MINING CORP. COMPLETES $21,000 NON-BROKERED FINANCING

April 8, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

April 4, 2008:
JASPER MINING CORP. COMPLETES $133,000 NON-BROKERED FINANCING

April 2, 2008:
JASPER MINING CORPORATION TO RAISE AN ADDITIONAL $21,000

March 12, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

March 7, 2008:
JASPER MINING CORPORATION TO RAISE $133,000

March 4, 2008:
JASPER MINING CORP. COMPLETES $367,500 NON-BROKERED FINANCING

Febuary 25, 2008:
JASPER MINING CORPORATION TO RAISE $367,500

January 21, 2008:
JASPER MINING CORPORATION INITIATES IP GEOPHYSICAL PROGRAM
AND FURTHER DRILLING ON MCFARLANE PROPERTY

December 19, 2007:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

December 11, 2007:
JASPER MINING CORPORATION CONTINUES DRILL PROGRAM ON MCFARLANE PROPERTY

December 6, 2007:
JASPER MINING CORPORATION CLOSES $150,000 PRIVATE PLACEMENT

November 19, 2007:
JASPER MINING CORPORATION COMMENCES FOLLOW-UP DRILL PROGRAM ON MCFARLANE PROPERTY

November 5, 2007:
JASPER MINING CORPORATION CLOSES $700,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 26, 2007:
JASPER MINING CORPORATION CLOSES $2,800,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 25, 2007:
JASPER MINING CORPORATION ANNOUNCES FOLLOW-UP EXPLORATION PROGRAM FOR MCFARLANE PROPERTY

October 5, 2007:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $3,500,000.00 WITH MINERALFIELDS

September 19, 2007:
FINAL SOIL RESULTS FROM ERIE CREEK PROPERTY

August 9, 2007:
PROSPECTING RESULTS FROM McFARLANE PROPERTY

July 12, 2007:
MANAGEMENT DISCUSSION ON LATEST HIGH GRADE MOLYBDENUM RESULTS FROM McFARLANE PROPERTY; 0.889% Mo OVER 7.3 M.

July 4, 2007:
JASPER MINING CORPORATION ANNOUNCES A HIGH GRADE MOLYBDENUM INTERVAL OF 7.3 METRES GRADING 0.889% MOLYBDENUM ON THE McFARLANE PROPERTYK

June 28, 2007:
JASPER MINING CORPORATION ANNOUNCES FURTHER RESULTS; ADDITIONAL DRILLING ON ERIE CREEK

May 28, 2007:
JASPER MINING CORPORATION DRILLS MULTIPLE HOLES CONTAINING MOLYBDENUM, COPPER AND TUNGSTEN AT ERIE CREEK

May 15, 2007:
JASPER MINING CORPORATION MOBILIZES DIAMOND DRILL ONTO McFARLANE PROPERTY

April 27, 2007:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM ERIE CREEK PROPERTY

April 9, 2007:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF
RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 27, 2007:
JASPER MINING CORPORATION - DIAMOND DRILL RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 9, 2007:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL TENURES BETWEEN LYDY AND MCFARLANE PROPERTIES

February 16, 2007:
JASPER MINING CORPORATION MOBILIZES ON TO ERIE CREEK PROPERTY

February 9, 2007:
JASPER MINING CORPORATION DISCUSSION OF SOIL RESULTS FROM ERIE CREEK PROPERTY AND THE ADDITION OF 5 MINERAL TENURES

January 23, 2007:
JASPER MINING CORPORATION 2007 UPDATE

December 21, 2006:
JASPER MINING CORP COMPLETES $50,000.00 NON-BROKERED FINANCING

December 14, 2006:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION ON RESULTS OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 12, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION
OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 11, 2006:
JASPER MINING CORPORATION TO RAISE $50,000.00 BY WAY OF PRIVATE PLACEMENT

November 29, 2006:
JASPER MINING CORPORATION ANNOUNCES SOIL RESULTS FROM ERIE CREEK PROPERTY

November 10, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

November 1, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL McFARLANE CELLS

October 25, 2006:
JASPER MINING CORPORATION COMMENCES IP GEOPHYSICAL SURVEY ON ISINTOK PROPERTY

October 18, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS FROM
DIAMOND DRILL PROGRAM ON IRONY PROPERTY

October 17, 2006:
JASPER MINING CORPORATION CONTINUES DIAMOND DRILLING ON ISINTOK PROPERTY

September 29, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SAWYER PROPERTY

September 28, 2006:
JASPER MINING CORPORATION DISCUSSION OF RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 26, 2006:
JASPER MINING CORPORATION ANNOUNCES FINAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 6, 2006:
JASPER MINING CORPORATION ANNOUNCES AIRBORNE GEOPHYSICAL RESULTS FROM STORM KING PROPERTY

September 5, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SANCA PROPERTY

September 5, 2006:
JASPER MINING CORPORATION COMMENCES DIAMOND DRILL PROGRAM ON IRONY PROPERTY

August 29, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

August 28, 2006:
JASPER MINING CORPORATION ANNOUNCES ADDITIONAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 11, 2006:
JASPER MINING CORPORATION ANNOUNCES CORRECTION ON INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 10, 2006:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 3, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON McFARLANE PROPERTY

August 1, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON LYDY PROPERTY

June 26, 2006:
JASPER MINING CORPORATION ANNOUNCES COMMENCEMENT OF AEROQUEST AIRBORNE GEOPHYSICAL SURVEY ON CRETACEOUS GRANITE PROJECT

June 6, 2006:
JASPER MINING CORPORATION - MANAGEMENT SPECULATION REGARDING RESULTS OF RECENT GEOPHYSICAL SURVEY ON IRONY PROPERTY

June 1, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON IRONY PROPERTY

May 30, 2006:
JASPER MINING ANNOUNCES MOBILIZATION OF DRILL ONTO MCFARLANE PROPERTY

May 9, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

May 5, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON PROXIMAL PROPERTY AND ACQUISITION OF ADDITIONAL MINERAL TENURE

April 28, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

April 24, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL ISINTOK CELLS

JASPER MINING CORPORATION
1020, 833 - 4TH AVENUE S.W.
CALGARY, ALBERTA, T2P 3T5
TELEPHONE: (403) 297-9480, FAX: (403) 266-1487

May 2, 2008
Trading Symbol: JSP (TSX-V)
News Release No. 08-181

NEWS RELEASE

JASPER MINING CORPORATION ANNOUNCES HIGH GRADE ANALYTICAL RESULTS FROM DRILL PROGRAM ON MCFARLANE PROPERTY

Jasper Mining Corporation (the “Company”) is pleased to announce analytical results from our ongoing diamond drill program on our 100% owned McFarlane property. A cumulative total of 78 holes (totaling approximately 14,000 metres of core) have been completed by the Company to date. The holes have been drilled to test a high grade molybdenite vein system previously reported in two adits (Ben Derby MINFILE occurrence 082FNE125) and the Company’s previous drill programs (See News Releases dated July 27, 2006 and July 4, 2007).

To summarize the program to date, the Company’s initial exploratory program in 2006 comprised a total of 7 drill holes from 3 drill pads, resulting in recovery of 1,821 metres of drill core, intended to follow-up anomalous surface soil results. The subsequent Phase I program in early 2007 comprised 5 drill holes from 5 pads, totaling 1,210 metres of drill core, intended to evaluate more aggressive anomalies as proposed by Aeroquest (identified from an Aeroquest airborne geophysical survey flown in 2006). A subsequent Phase II program was initiated in the fall of 2007, consisting of 21 drill holes, intended to test a mineralized vein system extending between the two adits (see News Release dated January 21, 2008).

The Phase II program, completed to date, comprises a cumulative total of approximately 11,000 metres of drill core, recovered from 66 drill holes along the existing road network between the two adits. Drill holes vary between 100 and 350 m in length and have been drilled to further develop and evaluate the molybdenite-bearing vein system which contains very encouraging grades of mineralization as documented in many intercepts to date. Molybdenite mineralization varies from coatings several mm thick along vein contacts, through fine- to very coarse-grained disseminations within quartz (+ pyrite +/- sericite +/- alkali feldspar) veins up to 1.6 m thick to thin (up to 2 cm thick) visually pure molybdenite veins.

The vein system appears to trend east-west with dip varying between steeply north and steeply south dipping. Quartz monzonite is the predominant host lithology, with overlying metasediments (metamorphosed sediments, characteristically having a very well developed penetrative foliation) hosting a subordinate proportion of molybdenite-bearing veins. Quartz + pyrite +/- sericite veins are relatively abundant throughout the drill core, however, vein density is highly variable.

The current high priority drill target is a vein system, consisting of up to two relatively thick molybdenite-bearing quartz veins and/or vein systems occurring between the two adits comprising the Ben Derby MINFILE occurrence. The two adits are separated by approximately 500 m map distance. The veins exposed within the adits are up to 1.5 m thick (estimated true thickness - Ben Derby adit) and generally contain highly anomalous molybdenite in association with very coarse-grained pyrite (to five cm in long dimension) and variable sericitic alteration.

A total of 171 samples have returned Mo values greater than 100 ppm. The following tabulation includes all mineralized intercepts having an analytical value in excess of 1000 ppm (0.1 %) Mo. Intervals for which an average grade has been determined for a contiguous series of multiple samples are highlighted in bold.:

Hole
Number
From
(m)
To
(m)
Width
(m)
Mo
(ppm)
Mo
(%)
MC-07-06
68.60
68.72
0.12
1292
0.129
MC-07-09
76.26
83.79
7.53
1887.8
0.189
including
76.26
76.38
0.12
2800
0.28
including
83.70
83.79
0.09
1179
0.118
110.48
110.54
0.06
10860
1.086
110.54
110.56
0.02
2830
0.283
110.59
110.64
0.05
1597
0.160
117.20
117.27
0.07
2510
0.251
149.32
149.39
0.07
14230
1.423
149.57
149.71
0.14
1131
0.113
155.86
156.00
0.14
1622
0.162
172.18
172.48
0.30
1271.2
0.127
including
172.24
172.35
0.11
1085
0.109
including
172.24
172.48
0.06
2980
0.298
180.93
181.07
0.14
2870
0.287
181.07
181.12
0.05
6180
0.618
226.17
226.46
0.29
1112
0.111
MC-07-10
22.34
27.13
4.79
1391.4
0.139
including
22.34
22.46
0.12
1846
0.185
including
26.70
26.88
0.18
1857
0.186
42.33
58.19
15.86
1642.8
0.1643
including
42.33
42.54
0.21
2700
0.270
including
58.10
58.19
0.09
1824
0.182
194.16
202.05
7.89
1791.2
0.179
including
194.16
196.76
2.6
1017
0.102
including
201.91
202.05
0.14
16170
1.617
215.88
225.75
9.87
914.5
0.091
including
215.88
216.06
0.18
2620
0.262
including
220.96
221.13
0.17
1480
0.148
including
222.57
222.87
0.30
1038
0.104
including
225.53
225.75
0.22
1165
0.117
MC-07-13
147.00
147.10
0.10
1412.5
0.141
MC-07-18
77.50
80.29
2.79
1530.7
0.153
including
77.50
78.82
1.32
3090
0.309
96.30
96.80
0.50
1014
0.101
MC-07-36
41.97
43.00
1.03
1474
0.147
MC-07-36
77.13
83.60
6.47
1402.1
0.140
including
77.13
77.25
0.12
2870
0.287

* Drill intercepts with veins were all at an inclined angle and so widths are not true widths

Core in each the sampled intervals was split, with one half submitted for analysis and one half retained for subsequent analysis. The core was submitted to Acme Analytical Laboratory Ltd in Vancouver, BC for Group 1DX analysis. Samples that returned Mo results greater than 2,000 ppm were re-submitted for re-analysis. Group 7KP - 0.50 gm analysis was utilized for more quantitative determination of high grade Mo results.

The intercept in Hole 6 is approximately 27 m due north of the Ben Derby adit at the western edge of the vein system drill tested to date. The intercept in Hole 13 is approximately 14 m due east of the Ben Derby adit. The intercepts in Holes 18, 20 and 36 are approximately 750 m eastnortheast of the Ben Derby adit, with the second adit a further 500 m due east. The intercepts in Hole 39 are approximately 20 m due west of the second adit, which is 1.15 km east of the Ben Derby adit. The intercepts in Holes 9 and 10 are between 400 and 1.3 km northeast of the second adit. Taken together, mineralization identified to date in the two adits and diamond drill holes reported to date extends up to 1.75 km northeast of the Ben Derby adit, with individual veins documented over a width of approximately 400 m.

Drill core recovered from the program continues to be evaluated and sampled, with samples submitted for analysis to Acme Laboratories Ltd in Vancouver, BC. Quantitative analytical results will continue to be released as received and evaluated by the Company. There has been a lengthy delay associated with analysis of samples submitted to Acme Laboratories, however, recent analyses have been returned on a timely basis.

Jasper management is encouraged with the McFarlane drilling results and expects to have sufficient information to have an independent resource evaluation prepared for the property.

The property is adjacent to and is contiguous with the Company’s Lydy property. Together the Lydy and McFarlane properties comprise a composite property of 4,259 ha (10,524 acres), encompassing an area 11 km east-west by 4 km north-south. Both the Lydy and McFarlane properties are 100% owned by the Company with potential for molybdenum plus copper plus/minus gold mineralization.

This press release has been prepared by Richard T. Walker, B.Sc., M .Sc., P. Geo., the “Qualified Person” under National Instrument 43-101.

For further information contact:
Gordon F. Dixon, Q.C., President, Jasper Mining Corporation
Telephone (403) 297-9480, Fax (403) 266-1487,
email: xon@telus.net or visit Jasper’s website at www.jaspermining.com
Investor Relations inquiries may be directed to Robert Rowell, Telephone (403) 668-4880, email: ir@beaumontcapital.ca

- 30 -

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.