To view this news release in PDF form please Click Here

All News Releases and Filing
Please visit www.sedar.com for a complete list of Jasper's news releases.

News Releases
Click on any of the news releases below to view them in PDF:

January 4, 2010:
JASPER MINING CORPORATION ANNOUNCES $1,000,000 PRIVATE PLACEMENT BY THE ISSUANCE OF FLOW-THROUGH SHARES.

November 25, 2009:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $3,000,000 BY THE ISSUANCE OF FLOW-THROUGH SHARES.

November 12, 2009:
JASPER MINING CORPORATION CLOSES $50,000 PRIVATE PLACEMENT.

November 9, 2009:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE $50,000.00 BY THE ISSUANCE OF FLOW-THROUGH SHARES.

July 16, 2009:
JASPER MINING CORPORATION APPOINTS NEW DIRECTOR.

July 15, 2009:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $2,000,000 BY THE ISSUANCE OF FLOW-THROUGH SHARES.

April 27, 2009:
JASPER MINING CORPORATION REPORTS 224.64 M GRADING 0.31% CU.EQ. FROM HOLE 50 FOR THE DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY.

April 20, 2009:
JASPER MINING CORPORATION - FURTHER RESULTS DOCUMENT 159.40 M GRADING 0.18% CU.EQ. FROM DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY.

April 14, 2009:
JASPER MINING CORPORATION - FURTHER RESULTS FOR HOLE 26 DOCUMENT 271.25 M GRADING 0.27% CU.EQ. FROM DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY.

March 11, 2009:
JASPER MINING CORPORATION CLARIFIES NEWS RELEASES.

January 27, 2009:
JASPER MINING CORPORATION REPORTS FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY.

January 23, 2009:
JASPER MINING CORPORATION CLOSES $137,200 PRIVATE PLACEMENT WITH FIRST MERCHANTS CAPITAL INC.

December 18, 2008:
JASPER MINING CORPORATION MINOR CORRECTIONS TO NEWS RELEASE ISSUED DECEMBER 17, 2008

December 17, 2008:
JASPER MINING CORPORATION - FIVE MORE DRILL HOLES HAVING IN EXCESS OF 0.2% COPPER EQUIVALENT, INCLUDING 212.43 M GRADING 0.265% CU.EQ. FROM DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY

December 12, 2008:
JASPER MINING CORPORATION - SIGNIFICANT HIGH GRADE RESULTS FROM DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY

December 9, 2008:
JASPER MINING CORPORATION - SIGNIFICANT HIGH GRADE RESULTS FROM DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY

November 19, 2008:
JASPER MINING CORPORATION - FURTHER HIGH GRADE RESULTS FROM 2008 DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY

November 13, 2008:
JASPER MINING CORPORATION ANNOUNCES AN AMENDMENT TO PRIVATE PLACEMENT TO RAISE UP TO $2,500,000 BY THE ISSUANCE OF FLOWTHROUGH SHARES

November 4, 2008:
JASPER MINING CORPORATION CLOSES $37,000 PRIVATE PLACEMENT

November 3, 2008:
JASPER MINING CORPORATION - FURTHER HIGH GRADE RESULTS FROM DIAMOND DRILL PROGRAM ON ISINTOK PROPERTY

October 28, 2008:
JASPER MINING CORPORATION MORE HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

October 27, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $2,500,000 BY THE ISSUANCE OF FLOW-THROUGH SHARES

October 20, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

October 15, 2008:
JASPER MINING CORPORATION
REPORTS DISCOVERY HOLE FROM ISINTOK PROPERTY 94.67 M GRADING 0.086% CU AND 0.015% MO (0.026% MOS2)

September 29, 2008:
JASPER MINING CORPORATION CLOSES $1,179,040 PRIVATE PLACEMENT WITH ANACORT CAPITAL INC.

September 29, 2008:
JASPER MINING CORPORATION MORE HIGH GRADE RESULTS FROM ISINTOK PROPERTY

September 25, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $111,000

September 4, 2008:
JASPER MINING CORPORATION - INITIAL DRILL RESULTS FROM 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

September 2, 2008:
JASPER MINING CORPORATION AMENDS EXPIRATION DATE OF SHARE OPTION GRANTS

August 28, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM AND TUNGSTEN RESULTS FROM MCFARLANE PROPERTY

August 21, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $1,200,000 WITH ANACORT CAPITAL INC.

July 23, 2008:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

July 11, 2008:
JASPER MINING CORPORATION CONTINUES TO ANNOUNCE HIGH GRADE MOLYBDENUM RESULTS FROM MCFARLANE PROPERTY

July 8, 2008:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $2,600,000.00 WITH MINERALFIELDS

July 2, 2008:
JASPER MINING CORPORATION COMMENCES 2008 EXPLORATION PROGRAM ON ISINTOK PROPERTY

June 24, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM THREE MORE HOLES ON MCFARLANE PROPERTY

June 20, 2008:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF RESULTS TO DATE ON MCFARLANE PROPERTY

May 29, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE MOLYBDENUM RESULTS FROM FOUR MORE HOLES ON MCFARLANE
PROPERTY

May 26, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY

May 6, 2008:
JASPER MINING CORPORATION ANNOUNCES FURTHER HIGH GRADE ANALYTICAL RESULTS FROM MCFARLANE PROPERTY AND SOME CORRECTIONS TO THE PRESS RELEASE OF MAY 2, 2008

May 2, 2008:
JASPER MINING CORPORATION ANNOUNCES HIGH GRADE ANALYTICAL RESULTS FROM DRILL PROGRAM ON MCFARLANE PROPERTY

April 11, 2008:
JASPER MINING CORP. COMPLETES $21,000 NON-BROKERED FINANCING

April 8, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

April 4, 2008:
JASPER MINING CORP. COMPLETES $133,000 NON-BROKERED FINANCING

April 2, 2008:
JASPER MINING CORPORATION TO RAISE AN ADDITIONAL $21,000

March 12, 2008:
JASPER MINING CORPORATION UPDATE FOR DRILL PROGRAM ON MCFARLANE PROPERTY

March 7, 2008:
JASPER MINING CORPORATION TO RAISE $133,000

March 4, 2008:
JASPER MINING CORP. COMPLETES $367,500 NON-BROKERED FINANCING

Febuary 25, 2008:
JASPER MINING CORPORATION TO RAISE $367,500

January 21, 2008:
JASPER MINING CORPORATION INITIATES IP GEOPHYSICAL PROGRAM
AND FURTHER DRILLING ON MCFARLANE PROPERTY

December 19, 2007:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

December 11, 2007:
JASPER MINING CORPORATION CONTINUES DRILL PROGRAM ON MCFARLANE PROPERTY

December 6, 2007:
JASPER MINING CORPORATION CLOSES $150,000 PRIVATE PLACEMENT

November 19, 2007:
JASPER MINING CORPORATION COMMENCES FOLLOW-UP DRILL PROGRAM ON MCFARLANE PROPERTY

November 5, 2007:
JASPER MINING CORPORATION CLOSES $700,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 26, 2007:
JASPER MINING CORPORATION CLOSES $2,800,000 PRIVATE PLACEMENT WITH MINERALFIELDS GROUP

October 25, 2007:
JASPER MINING CORPORATION ANNOUNCES FOLLOW-UP EXPLORATION PROGRAM FOR MCFARLANE PROPERTY

October 5, 2007:
JASPER MINING CORPORATION ANNOUNCES PRIVATE PLACEMENT TO RAISE UP TO $3,500,000.00 WITH MINERALFIELDS

September 19, 2007:
FINAL SOIL RESULTS FROM ERIE CREEK PROPERTY

August 9, 2007:
PROSPECTING RESULTS FROM McFARLANE PROPERTY

July 12, 2007:
MANAGEMENT DISCUSSION ON LATEST HIGH GRADE MOLYBDENUM RESULTS FROM McFARLANE PROPERTY; 0.889% Mo OVER 7.3 M.

July 4, 2007:
JASPER MINING CORPORATION ANNOUNCES A HIGH GRADE MOLYBDENUM INTERVAL OF 7.3 METRES GRADING 0.889% MOLYBDENUM ON THE McFARLANE PROPERTYK

June 28, 2007:
JASPER MINING CORPORATION ANNOUNCES FURTHER RESULTS; ADDITIONAL DRILLING ON ERIE CREEK

May 28, 2007:
JASPER MINING CORPORATION DRILLS MULTIPLE HOLES CONTAINING MOLYBDENUM, COPPER AND TUNGSTEN AT ERIE CREEK

May 15, 2007:
JASPER MINING CORPORATION MOBILIZES DIAMOND DRILL ONTO McFARLANE PROPERTY

April 27, 2007:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM ERIE CREEK PROPERTY

April 9, 2007:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION OF
RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 27, 2007:
JASPER MINING CORPORATION - DIAMOND DRILL RESULTS FROM 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

March 9, 2007:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL TENURES BETWEEN LYDY AND MCFARLANE PROPERTIES

February 16, 2007:
JASPER MINING CORPORATION MOBILIZES ON TO ERIE CREEK PROPERTY

February 9, 2007:
JASPER MINING CORPORATION DISCUSSION OF SOIL RESULTS FROM ERIE CREEK PROPERTY AND THE ADDITION OF 5 MINERAL TENURES

January 23, 2007:
JASPER MINING CORPORATION 2007 UPDATE

December 21, 2006:
JASPER MINING CORP COMPLETES $50,000.00 NON-BROKERED FINANCING

December 14, 2006:
JASPER MINING CORPORATION - MANAGEMENT DISCUSSION ON RESULTS OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 12, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION
OF 2006 EXPLORATION PROGRAM ON ISINTOK PROPERTY

December 11, 2006:
JASPER MINING CORPORATION TO RAISE $50,000.00 BY WAY OF PRIVATE PLACEMENT

November 29, 2006:
JASPER MINING CORPORATION ANNOUNCES SOIL RESULTS FROM ERIE CREEK PROPERTY

November 10, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

November 1, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL McFARLANE CELLS

October 25, 2006:
JASPER MINING CORPORATION COMMENCES IP GEOPHYSICAL SURVEY ON ISINTOK PROPERTY

October 18, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS FROM
DIAMOND DRILL PROGRAM ON IRONY PROPERTY

October 17, 2006:
JASPER MINING CORPORATION CONTINUES DIAMOND DRILLING ON ISINTOK PROPERTY

September 29, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SAWYER PROPERTY

September 28, 2006:
JASPER MINING CORPORATION DISCUSSION OF RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 26, 2006:
JASPER MINING CORPORATION ANNOUNCES FINAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

September 6, 2006:
JASPER MINING CORPORATION ANNOUNCES AIRBORNE GEOPHYSICAL RESULTS FROM STORM KING PROPERTY

September 5, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL PROGRAM ON SANCA PROPERTY

September 5, 2006:
JASPER MINING CORPORATION COMMENCES DIAMOND DRILL PROGRAM ON IRONY PROPERTY

August 29, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

August 28, 2006:
JASPER MINING CORPORATION ANNOUNCES ADDITIONAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 11, 2006:
JASPER MINING CORPORATION ANNOUNCES CORRECTION ON INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 10, 2006:
JASPER MINING CORPORATION ANNOUNCES INITIAL RESULTS FROM DRILL PROGRAM ON ISINTOK PROPERTY

August 3, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON McFARLANE PROPERTY

August 1, 2006:
JASPER MINING CORPORATION ANNOUNCES RESULTS OF AIRBORNE GEOPHYSICAL SURVEY ON LYDY PROPERTY

June 26, 2006:
JASPER MINING CORPORATION ANNOUNCES COMMENCEMENT OF AEROQUEST AIRBORNE GEOPHYSICAL SURVEY ON CRETACEOUS GRANITE PROJECT

June 6, 2006:
JASPER MINING CORPORATION - MANAGEMENT SPECULATION REGARDING RESULTS OF RECENT GEOPHYSICAL SURVEY ON IRONY PROPERTY

June 1, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON IRONY PROPERTY

May 30, 2006:
JASPER MINING ANNOUNCES MOBILIZATION OF DRILL ONTO MCFARLANE PROPERTY

May 9, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

NewsNov12-2009May 5, 2006:
JASPER MINING CORPORATION ANNOUNCES COMPLETION OF AIRBORNE SURVEY ON PROXIMAL PROPERTY AND ACQUISITION OF ADDITIONAL MINERAL TENURE

April 28, 2006:
JASPER MINING CORPORATION GRANTS SHARE OPTIONS

April 24, 2006:
JASPER MINING CORPORATION ACQUIRES ADDITIONAL ISINTOK CELLS

JASPER MINING CORPORATION
1020, 833 - 4TH AVENUE S.W.
CALGARY, ALBERTA, T2P 3T5
TELEPHONE: (403) 297-9480, FAX: (403) 266-1487

January 5, 2010
Trading Symbol: JSP (TSX-V)
News Release No. 10-220-02

NEWS RELEASE

JASPER MINING CORPORATION ANNOUNCES USE OF PROCEEDS FOR RECENT FINANCING

Jasper Mining Corporation (“Jasper”) is pleased to announce that during 2009 it raised $1,050,000 by flow-through share placements. These proceeds will be used by Jasper on the following projects, namely:

(a) Jasper’s McFarlane molybdenum property has 20 diamond drill cores to split and assay. A total of 100 diamond drill holes have been completed on McFarlane and approximately 20 remain to be split and assayed. As part of the current assaying, some of the holes will be assayed from top to bottom in order to determine the presence of disseminated molybdenum between the high grade intersections.

(b) Jasper’s Isintok copper/molybdenum/silver/gold property as 18 diamond drill cores to split and assay. A total of 59 holes have been drilled on Isintok and 18 of the holes remain to be
split and assayed. It is Jasper’s intention to drill several deep holes from the surface at Isintok from the west of the current drilling area in an easterly direction at a decline of greater than 60 degrees to a depth of approximately 2500 meters with the hope of intersecting high grade mineralization below the present depths drilled by Jasper. The existing drill cores have been drilled to a depth of 300 meters. As reported in Jasper’s news release (#09-216-06) dated April 27, 2009 a 224.64 meter intersection grading 0.31% Cu.EQ from hole 50 and a 271.25 meter intersection grading 0.27% Cu. EQ from diamond drill hole 26 as reported in Jasper’s news release (#09-214-04) dated April 14, 2009 are regarded by Jasper management as very encouraging.

(c) Drill 2 to 3 diamond drill holes on Jasper’s Faith gold property as indicated by the gold in soils data collected by Jasper.

(d) Drill 2 to 3 diamond drill holes on Jasper’s Sawyer lead/zinc property where indicated by assayed surface samples and airborne geophysical anomalies.

The assaying of the existing cores will begin immediately with the drilling to commence as weather permits.

For further information contact:
Gordon F. Dixon, Q.C., President, Jasper Mining Corporation
Telephone (403) 297-9480, Fax (403) 266-1487,
email: xon@telus.net

- 30 -

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the inadequacy or accuracy of this release.